Wednesday, September 7, 2016

Fwd: Report warns of additional commercial crew delays

Report warns of additional commercial crew delays - SpaceNews.com

As I said-- COMMERCIAL effort NOT the Answer for the most powerful nation on earth!
We must be the only space Super Bobby Martin 



Sent from my iPad

Begin forwarded message:

From: "Gary Johnson" <gjohnson144@comcast.net>
Date: September 7, 2016 at 10:27:35 AM CDT
To: "Gary Johnson" <gjohnson144@comcast.net>
Subject: FW: Report warns of additional commercial crew delays

 

http://spacenews.com/wp-content/themes/spacenews/assets/img/logo.png

 

Report warns of additional commercial crew delays

by Jeff Foust — September 6, 2016

Technical problems could delay the beginning of regular flights by SpaceX's Crew Dragon (left) and Boeing's CST-100 Starliner until at least late 2018. Credit: SpaceX artist's concept and BoeingTechnical problems could delay the beginning of regular flights by SpaceX's Crew Dragon (left) and Boeing's CST-100 Starliner until at least late 2018. Credit: SpaceX artist's concept and Boeing

KENNEDY SPACE CENTER, Fla. — The two companies developing commercial crew transportation systems for NASA are experiencing problems that will likely push back the beginning of regular flights until at least late 2018, an agency report warned.

The report by the NASA Office of Inspector General (OIG), released Sept. 1, also concluded that those delays may force NASA to purchase additional seats on Russian Soyuz flights to and from the International Space Station, the cost of which has grown significantly over the last decade.

The report argued that while previous delays in the overall commercial crew development program could be blamed on funding shortfalls, more recent delays have their roots in technical problems both Boeing and SpaceX are experiencing in the development of the respective vehicles, the CST-100 Starliner and Crew Dragon.

"While past funding shortfalls have contributed to the delay, technical challenges are now driving schedule slippages," the report stated. "Notwithstanding the contractors' optimism, based on the information we gathered during our audit, we believe it unlikely that either Boeing or SpaceX will achieve certified, crewed flight to the ISS until late 2018."

As of June, Boeing had completed 15 of 34 milestones in its Commercial Crew Transportation Capability (CCtCap) contract with NASA, valued at $1.067 billion, according to the report. The company has experienced problems, though, with the CST-100's development, including mass growth and aeroacoustical loads on its Atlas 5 rocket during launch. Earlier this year, Boeing delayed an uncrewed test flight of the spacecraft to December 2017 and a crewed test flight — likely to carry one NASA astronaut and one Boeing test pilot — until February 2018.

SpaceX, according to the report, has completed eight of 21 milestones under its CCtCap contract and received $469 million. Its issues with Crew Dragon stem in large part from a design change from a spacecraft that would land on dry land to one that will splash down. "This resulted in significant challenges, including complications with vendor components and the effectiveness of the integrated landing system designed to ensure parachutes work and the capsule does not take on excessive water after landing in the ocean," the report stated.

The report added that SpaceX, which was planning uncrewed and crewed test flights in mid-2017, was encountering issues with several other vehicle subsystems, including the spacecraft's parachutes and the tunnel allowing the crew to move between the Dragon and the ISS. SpaceX also hadn't completed all the milestones associated with a critical design review. "Accordingly, we anticipate additional schedule slippage and do not expect certified flights by SpaceX earlier than late 2018," the report stated.

That assessment came before the Sept. 1 pad accident at Space Launch Complex 40 at Cape Canaveral that destroyed a Falcon 9 and its satellite payload and damaged pad infrastructure. While commercial crew missions will launch from Launch Complex 39A here, the investigation into the failure could delay upcoming launches, including commercial crew test flights.

SpaceX argued in the report that a prior Falcon 9 launch failure in June 2015 did not have a major effect on its commercial crew work. "Although SpaceX officials told us that the [2015] mishap has not delayed its crew development efforts because it had built sufficient margin into the schedule," the OIG report stated, "they also noted the lack of margin remaining to accommodate any additional unexpected issues that may arise."

A delay to late 2018, and the possibility of additional delays, could require NASA to purchase additional Soyuz flight services, which currently run through 2018. The report noted that the price of Soyuz seats charged to NASA by Roscosmos has increased by 384 percent since NASA first acquired seats in 2006, to nearly $82 million for six seats in 2018.

The NASA Advisory Council, meeting in Cleveland in July, expressed similar concerns about needing to buy additional Soyuz seats, adding that NASA would likely need to make a decision soon.

"Due to the long lead time to procure Soyuz seats, a decision must be made really very shortly — before the end of 2016 — to guarantee access to the ISS in 2019," said Wayne Hale, interim chairman of the council's human exploration and operations committee, at the July 28 meeting, "or we may be forced to reduce or possibly eliminate its crew complement."

NASA had planned to hold a commercial crew update here Sept. 6 in advance of the Sept. 8 launch of the agency's OSIRIS-REx asteroid sample return mission. Media arriving at the center for the event were told the event was canceled, without explanation.

 © 2016 SpaceNews, Inc. All rights reserved.

 


 

Fwd: Report warns of additional commercial crew delays



Sent from my iPad

Begin forwarded message:

From: "Gary Johnson" <gjohnson144@comcast.net>
Date: September 7, 2016 at 10:27:35 AM CDT
To: "Gary Johnson" <gjohnson144@comcast.net>
Subject: FW: Report warns of additional commercial crew delays

 

http://spacenews.com/wp-content/themes/spacenews/assets/img/logo.png

 

Report warns of additional commercial crew delays

by Jeff Foust — September 6, 2016

Technical problems could delay the beginning of regular flights by SpaceX's Crew Dragon (left) and Boeing's CST-100 Starliner until at least late 2018. Credit: SpaceX artist's concept and BoeingTechnical problems could delay the beginning of regular flights by SpaceX's Crew Dragon (left) and Boeing's CST-100 Starliner until at least late 2018. Credit: SpaceX artist's concept and Boeing

KENNEDY SPACE CENTER, Fla. — The two companies developing commercial crew transportation systems for NASA are experiencing problems that will likely push back the beginning of regular flights until at least late 2018, an agency report warned.

The report by the NASA Office of Inspector General (OIG), released Sept. 1, also concluded that those delays may force NASA to purchase additional seats on Russian Soyuz flights to and from the International Space Station, the cost of which has grown significantly over the last decade.

The report argued that while previous delays in the overall commercial crew development program could be blamed on funding shortfalls, more recent delays have their roots in technical problems both Boeing and SpaceX are experiencing in the development of the respective vehicles, the CST-100 Starliner and Crew Dragon.

"While past funding shortfalls have contributed to the delay, technical challenges are now driving schedule slippages," the report stated. "Notwithstanding the contractors' optimism, based on the information we gathered during our audit, we believe it unlikely that either Boeing or SpaceX will achieve certified, crewed flight to the ISS until late 2018."

As of June, Boeing had completed 15 of 34 milestones in its Commercial Crew Transportation Capability (CCtCap) contract with NASA, valued at $1.067 billion, according to the report. The company has experienced problems, though, with the CST-100's development, including mass growth and aeroacoustical loads on its Atlas 5 rocket during launch. Earlier this year, Boeing delayed an uncrewed test flight of the spacecraft to December 2017 and a crewed test flight — likely to carry one NASA astronaut and one Boeing test pilot — until February 2018.

SpaceX, according to the report, has completed eight of 21 milestones under its CCtCap contract and received $469 million. Its issues with Crew Dragon stem in large part from a design change from a spacecraft that would land on dry land to one that will splash down. "This resulted in significant challenges, including complications with vendor components and the effectiveness of the integrated landing system designed to ensure parachutes work and the capsule does not take on excessive water after landing in the ocean," the report stated.

The report added that SpaceX, which was planning uncrewed and crewed test flights in mid-2017, was encountering issues with several other vehicle subsystems, including the spacecraft's parachutes and the tunnel allowing the crew to move between the Dragon and the ISS. SpaceX also hadn't completed all the milestones associated with a critical design review. "Accordingly, we anticipate additional schedule slippage and do not expect certified flights by SpaceX earlier than late 2018," the report stated.

That assessment came before the Sept. 1 pad accident at Space Launch Complex 40 at Cape Canaveral that destroyed a Falcon 9 and its satellite payload and damaged pad infrastructure. While commercial crew missions will launch from Launch Complex 39A here, the investigation into the failure could delay upcoming launches, including commercial crew test flights.

SpaceX argued in the report that a prior Falcon 9 launch failure in June 2015 did not have a major effect on its commercial crew work. "Although SpaceX officials told us that the [2015] mishap has not delayed its crew development efforts because it had built sufficient margin into the schedule," the OIG report stated, "they also noted the lack of margin remaining to accommodate any additional unexpected issues that may arise."

A delay to late 2018, and the possibility of additional delays, could require NASA to purchase additional Soyuz flight services, which currently run through 2018. The report noted that the price of Soyuz seats charged to NASA by Roscosmos has increased by 384 percent since NASA first acquired seats in 2006, to nearly $82 million for six seats in 2018.

The NASA Advisory Council, meeting in Cleveland in July, expressed similar concerns about needing to buy additional Soyuz seats, adding that NASA would likely need to make a decision soon.

"Due to the long lead time to procure Soyuz seats, a decision must be made really very shortly — before the end of 2016 — to guarantee access to the ISS in 2019," said Wayne Hale, interim chairman of the council's human exploration and operations committee, at the July 28 meeting, "or we may be forced to reduce or possibly eliminate its crew complement."

NASA had planned to hold a commercial crew update here Sept. 6 in advance of the Sept. 8 launch of the agency's OSIRIS-REx asteroid sample return mission. Media arriving at the center for the event were told the event was canceled, without explanation.

 © 2016 SpaceNews, Inc. All rights reserved.

 


 

Tuesday, September 6, 2016

Fwd: 10 Years Since STS-115



Sent from my iPad

Begin forwarded message:

From: "Gary Johnson" <gjohnson144@comcast.net>
Date: September 5, 2016 at 9:35:17 AM CDT
To: "Gary Johnson" <gjohnson144@comcast.net>
Subject: FW: 10 Years Since STS-115

 

AmericaSpace

AmericaSpace

For a nation that explores
September 3rd, 2016

In For the Long Haul: 10 Years Since STS-115 (Part 1)

By Ben Evans

 

Joe Tanner had already performed five EVAs before STS-115 left Earth. By the time he returned from the mission, he had completed seven EVAs and spent 46.5 hours outside a spacecraft. Even today, he stands as the 13th most seasoned spacewalker of all time. Photo Credit: NASA, via Joachim Becker/SpaceFacts.de

Joe Tanner had already performed five EVAs before STS-115 left Earth. By the time he returned from the mission, he had completed seven EVAs and spent 46.5 hours outside a spacecraft. Even today, he stands as the 13th most seasoned spacewalker of all time. Photo Credit: NASA, via Joachim Becker/SpaceFacts.de

At first glance, shuttle mission STS-115—launched 10 years ago, this month—seemed to have it all: a rendezvous and docking with the International Space Station (ISS), multiple spacewalks by crew members of different gender and nationality, and an intense plate of robotics activity. Moreover, Commander Brent Jett, Pilot Chris Ferguson, and Mission Specialists Joe Tanner, Dan Burbank, Heidemarie Stefanyshyn-Piper, and Canada's Steve MacLean officially restarted the on-orbit construction of the multi-national outpost in the wake of the Columbia tragedy. In the weeks preceding their 9 September 2006 liftoff, Jett noted that the four flight-seasoned veterans on his crew had always launched on-time, with no delays, which proved something of an omen. As circumstances transpired, STS-115 was delayed several times. In fact, after working together on the mission for more than 4.5 years, Jett's team had the longest training template of any shuttle crew.

Formally announced by NASA in February 2002—having been assigned on 7 February, Stefanyshyn-Piper's 39th birthday—the six astronauts were tasked with installing the P-3/P-4 segment onto the space station's Integrated Truss Structure (ITS). This particular segment, as its name implied, formed part of the "port" side of the ITS and would be directly mated onto the P-1 segment, launched on STS-113 in November 2002. Weighing in excess of 35,000 pounds (15,875 kg) on the ground, the P-3/P-4 segment would provide a quarter of the station's power capability. Its hexagonal-shaped P-3 component was connected to the Solar Alpha Rotary Joint (SARJ), which rotated the electricity-generating solar arrays, allowing them to continuously track the Sun. Finally, its P-4 component held the canisters for the array blankets themselves, which would be deployed in opposite directions to a total length of almost 240 feet (73 meters). On the ground, the integrated P-3/P-4 hardware measured about 45 feet (13 meters) in length, allowing it to fit snugly into the shuttle's payload bay, but on-orbit it would dramatically expand to change the appearance of the entire ISS.

The configuration of the International Space Station (ISS) in the late summer of 2006, with the P-3/P-4 truss segment and deployed solar array wings clearly visible at right. Image Credit: NASA

The configuration of the International Space Station (ISS) in the late summer of 2006, with the P-3/P-4 truss segment and deployed solar array wings clearly visible at right. Image Credit: NASA

Once installed, the arrays on the end of P-4 would each generate a couple of kilowatts of electrical power; effectively doubling the station's power supply and roughly equivalent of meeting the needs of 30 average homes on Earth. With three spacewalks scheduled to performed by Tanner, Burbank, Stefanyshyn-Piper, and MacLean, STS-115 would contribute to making 2003 the most EVA-intensive year in history. All told, no fewer than 24 spacewalks were planned, spread across five shuttle missions and two long-duration ISS expeditions. With their launch originally targeted for April 2003, Jett's crew would fly during a year which would see all but one element of the massive, 11-piece ITS completed, with dual pairs of solar arrays at its port and starboard extremities. Indeed, by the end of 2003, the ITS would have expanded in length from 134 feet (40.8 meters) to 310 feet (94.5 meters).

By the time that Columbia and her crew were lost during re-entry on 1 February 2003, the launch date for Jett's mission had slipped to no earlier than 23 May. All shuttle flights were immediately stood down, pending the completion of the Columbia Accident Investigation Board (CAIB) and NASA's efforts to return the fleet of three surviving orbiters—Discovery, Atlantis, and Endeavour—to operational flight status. During the course of the next few years, most of the original crews were partially reassigned, with two highly-experienced shuttle commanders rotated into management roles and others shifted onto other flights. However, unusually, the crew of STS-115 remained entirely intact, to such an extent that by the time they finally rose to orbit on 9 September 2006 an astonishing 1,656 days had elapsed since their assignment. This was far longer than any other single shuttle crew, including Commander John Young and Pilot Bob Crippen on STS-1, whose formal training spanned a little more than three years.

"You can't stay focused for four years; it's impossible," said Brent Jett before the flight. In his mind, the most important role of the Commander was to provide leadership and prepare his crew for launch. "We're one of the few crews that were assigned at the time of the accident. In fact, we were fairly close to launch; we've all stayed together. We haven't had any crew changes. Our mission has stayed pretty much the same over the four years. So you don't try to keep everybody focused: you let everybody, at the appropriate times, take a step back, get away from the mission a little bit, and then bring everybody back and have them peak at the right time."

The STS-115 crew. From left are Chris Ferguson, Heidemarie Stefanyshyn-Piper, Joe Tanner, Brent Jett, Steve MacLean and Dan Burbank. Photo Credit: NASA, via Joachim Becker/SpaceFacts.de

The STS-115 crew. From left are Chris Ferguson, Heidemarie Stefanyshyn-Piper, Joe Tanner, Brent Jett, Steve MacLean, and Dan Burbank. Photo Credit: NASA, via Joachim Becker/SpaceFacts.de

From her perspective, Stefanyshyn-Piper agreed. "When the Columbia accident happened, we were about three months from flight," she remembered. "Up to that point, we had been marching along for a May 2003 launch date. After the accident, that obviously was put on hold." During the down time, many members of the crew were detailed to support the actions of the CAIB and NASA's efforts to return the shuttle flight to operations. The STS-115 crew periodically came back together for proficiency training and, for about a year Stefanyshyn-Piper undertook technical duties associated with cooling the U.S. space suits aboard the station. "That was something that helped me understand more about the suits, so now I know more about the suit and I know more about station systems," she said. "We knew that we had a mission and that one day we would be going back to flying. Doing technical jobs and training together kept that focus that we needed."

Following the resumption of shuttle operations after the loss of Columbia, STS-115 found itself in third place, bringing up the rear after a pair of logistics flights, STS-114 in July 2005 and STS-121 in July 2006. Originally targeted to launch in late August 2006, Jett's mission met with delay when managers decided to replace securing bolts on Atlantis' Ku-band communications antenna. Far more significant was the threat posed by lightning. On the 25th, a direct strike—the most powerful ever recorded at the Kennedy Space Center (KSC) in Florida—occurred on the lightning mast at Pad 39B. Additional delays were imposed to assess the potential damage and hopes to get Atlantis into orbit before month's end came to nothing as Hurricane Ernesto regained power and prompted a rollback of the shuttle to the Vehicle Assembly Building (VAB). This produced an interesting situation. Late on the morning of the 29th, the STS-115 rollback commenced, but was halted on the crawlerway by early afternoon, when a decision was made to return to the pad. Meteorologists had determined that Ernesto would probably miss the Cape and its peak winds were anticipated to be somewhat lower than the maximum limit for retaining the vehicle on the pad.

An initial launch attempt on 8 September was called off, when one of four Engine Cutoff (ECO) sensors aboard the External Tank (ET) reportedly failed. The tank was drained and the other three sensors correctly indicated it as being "dry," leading to a decision to allow a launch attempt on the 9th with three-quarters of the sensors operational. Without further ado, Atlantis roared into orbit at 11:15 a.m. EDT, heading for the space station and its incumbent Expedition 13 crew of Commander Pavel Vinogradov and Flight Engineers Thomas Reiter of the European Space Agency (ESA) and Jeff Williams of NASA.

The shuttle's ascent was flawless, with the exception that Mission Control asked Jett and Ferguson to reconfigure the Flash Evaporator System (FES), which exhibited a temporary ice buildup. The reconfiguration cleared the issue and the FES operated normally throughout the remainder of the climb to space. Ahead lay a day of minute inspections of Atlantis' exterior surfaces, to verify that no damage had been incurred during ascent. And after that, on 11 September, lay the space station and the resumption of construction work left undone in more than three years since Columbia's untimely loss.

 

Copyright © 2016 AmericaSpace - All Rights Reserved

 


 

 

AmericaSpace

AmericaSpace

For a nation that explores
September 4th, 2016

Camping Without Marshmallows: 10 Years Since STS-115 (Part 2)

By Ben Evans

 

Dan Burbank and Steve MacLean are barely visible, slightly right-of-center, working on the P-3/P-4 truss during EVA-2. Photo Credit: NASA

Dan Burbank and Steve MacLean are barely visible, slightly right-of-center, working on the P-3/P-4 truss during EVA-2. Photo Credit: NASA

Ten years ago, this month, the crew of shuttle Atlantis—Commander Brent Jett, Pilot Chris Ferguson and Mission Specialists Joe Tanner, Dan Burbank, Heidemarie Stefanyshyn-Piper and Canada's Steve MacLean—roared into orbit to restart the construction of the International Space Station (ISS). Following the delivery of its initial elements into space from December 1998, the station had steadily grown from a couple of modules to the basis of today's multi-national outpost: with the U.S. Destiny lab, the Quest airlock, the Canadian-built Canadarm2 mechanical arm and the first set of electricity-generating solar arrays, batteries and radiators. However, that single set of arrays provided barely a quarter of the power which the station would eventually need to support its remaining science modules. On STS-115, Jett's crew would deliver the P-3/P-4 truss segment, equipped with a second set of arrays, batteries and radiators to double the station's existing power capability.

As outlined in yesterday's AmericaSpace history article, the STS-115 crew was announced by NASA in February 2002 and trained for an original launch date in the first half of 2003. At the time of the Columbia disaster, Jett and his team were less than 16 weeks away from liftoff. All shuttle crews were stood down as the Columbia Accident Investigation Board (CAIB)—chaired by former U.S. Navy Adm. Harold Gehman—worked to identify the causes and contributory factors in the disaster and NASA pressed ahead with its efforts to return the surviving orbiters to flight. Most of the shuttle crews-in-training at the time of Columbia's loss were broken up and reassigned, but the six-strong STS-115 team remained intact. So too did their basic mission profile.

However, there were several significant changes between the STS-115 planned before Columbia and the STS-115 which actually rose to orbit in September 2006. In keeping with post-Columbia requirements, the first and second days of the mission included a thorough checkout of the shuttle's Thermal Protection System (TPS) and Reinforced Carbon-Carbon (RCC) surfaces to identify any areas which may have sustained damage during launch. Burbank and MacLean, working with Ferguson, grappled the 50-foot-long (45-meter) Orbiter Boom Sensor System (OBSS) with the Canadian-built Remote Manipulator System (RMS) mechanical arm and employed its high-resolution television camera and twin laser sensors to conduct an eight-hour-plus inspection of Atlantis' wing leading edges and nosecap. "It's a series of automated maneuvers, so we're essentially relegated to the role of monitoring the automatic activity that's going on," said Ferguson before launch. "While it's a highly-focused and intensive task, we are able to back out a little bit and monitor the computer's automated system. It's a long day and it's going to be a tedious day, but we're prepared for it."

The STS-115 crew. From left are Chris Ferguson, Heidemarie Stefanyshyn-Piper, Joe Tanner, Brent Jett, Steve MacLean and Dan Burbank. Photo Credit: NASA, via Joachim Becker/SpaceFacts.de

The STS-115 crew. From left are Chris Ferguson, Heidemarie Stefanyshyn-Piper, Joe Tanner, Brent Jett, Steve MacLean and Dan Burbank. Photo Credit: NASA, via Joachim Becker/SpaceFacts.de

With docking targeted for 6:46 a.m. EDT on 11 September, the crew was awakened several hours beforehand, to a rousing cello performance by Dan Burbank's children. Another facet of the post-Columbia regime required Jett to fly Atlantis through a Rendezvous Pitch Maneuver (RPM). In essence, this took the form of an orbital "back flip" at a distance of about 600 feet (180 meters), which allowed Jeff Williams aboard the ISS to extensively photo-document the condition of the shuttle's flight surfaces for damage. For the photo-documentation, Williams was based in the station's Zvezda service module with digital camera equipment, equipped with 400 mm and 800 mm lenses.

"The RPM maneuver…is actually very visually dramatic," said Jett, "but from a flying standpoint, it's not really any more difficult than any other type flying we do for rendezvous. The real significance of the RPM is that it allows the station crew to take photos of the underbelly tile areas of the orbiter, which we don't inspect on Flight Day Two." From his perspective, Jett set up the initial conditions to begin the RPM, allowed it to happen, then assumed control of Atlantis at the end to continue the approach and docking. His target was Pressurized Mating Adapter (PMA)-2 at the forward "end" of the U.S. Destiny lab and he performed a smooth docking at 6:48 a.m. Within two hours, after pressurization and leak checks, the hatches were opened and nine astronauts and cosmonauts from four sovereign nations engulfed each other in smiles, handshakes and bear-hugs.

Yet there was little time to reflect on their surroundings. Almost immediately, Ferguson and Burbank grappled the massive P-3/P-4 truss with the shuttle's RMS and detached it from the payload bay. Coming so soon after docking, it was "a long, long day", according to Jett. Aboard the ISS, MacLean joined Williams at a Robotic Workstation (RWS) to employ the space station's own Canadarm2 to receive the truss and ready it for installation. With MacLean operating Canadarm2, this marked the first occasion that a Canadian citizen had operated the station's arm in orbit.

At 2 a.m. EDT on the 12th, MacLean and Williams maneuvered the P-3/P-4 segment toward its eventual location at the far-port end of the P-1 truss. It remained on the end of Canadarm2 overnight, in a thermally benign "overnight park" position, ahead of the first EVA, conducted by Tanner and Stefanyshyn-Piper. The decision to split the installation over two days was based purely upon the mission protocols. "If we wait till the next day, we just don't have enough time in the day to get everything done with the arm maneuvers," said Tanner. The need for at least two hours to simply get the P-3/P-4 segment out of Atlantis' payload bay, followed by several more hours of constant attention to get it transferred over to Canadarm2 and installed onto its P-1 location, made it more advantageous to split the activities into two halves. By leaving the truss in the overnight park condition, it would not get too hot or cold and would remain healthy until it was installed onto the space station the following morning.

Assisted by Expedition 13's Thomas Reiter, STS-115 Mission Specialist Steve MacLean pre-breathes on a mask inside the Quest airlock, ahead of EVA-2. Photo Credit: NASA

Assisted by Expedition 13's Thomas Reiter, STS-115 Mission Specialist Steve MacLean pre-breathes on a mask inside the Quest airlock, ahead of EVA-2. Photo Credit: NASA

With the Quest airlock having been installed onto the space station in July 2001, this would not be the first time that it had been used by spacewalkers to begin their EVAs.  However, the first EVA of STS-115 was notably different from its predecessors, in that Tanner and Stefanyshyn-Piper performed an overnight "campout" in the airlock, whose pressure had been reduced from its ambient 14.7 psi to 10.2 psi. Unfortunately, on this occasion, it would be a campout without marshmallows! The campout prebreathe had been trialed by Expedition 12/13 astronauts Bill McArthur and Jeff Williams in April 2006, but on STS-115 it would be utilized for the first time before a "real" EVA.

"If we can spend some time at 10.2, before going down to the final suit pressure of 4.3, that time spent breathing pure oxygen gets reduced significantly, from four hours to the 45-minutes-to-an-hour range," Jett explained. "That's a big saving, when you're trying to get a 6.5 or 7-hour EVA done. On the shuttle when we weren't docked to station, we could take the shuttle to 10.2; it wasn't a big deal. We can't do that with the entire station, so we take the two EVA crew members and put them in the equipment lock of the airlock. We close the hatch and just take that one section of the station down to 10.2." By spending the night at this reduced pressure level, not only was nitrogen purged from Tanner and Stefanyshyn-Piper's bloodstreams—thereby reducing the risk of the "bends"—but their final pre-EVA preparations were correspondingly shortened, allowing them to better function at the 4.3 psi pressure of their suits.

"The downside is that you probably have to go to the bathroom in the morning, and so we will do what we refer to as a hygiene break," recalled Tanner. "For that break, you must put on an oxygen mask. We repressurize the station airlock, so that we can open the hatch, and then while wearing this oxygen mask, you go to the bathroom and come back in and the total amount on the mask is 70 minutes. Once you get back in the airlock, depress it again down to 10.2 and if you've achieved your 70 minutes on the mask, then you can take the mask off and do a normal suit-up."

Tanner and Stefanyshyn-Piper floated out of Quest at 5:17 a.m. EDT and spent six hours and 26 minutes in vacuum, connecting power cables, releasing launch restraints on P-3/P-4's Solar Array Blanket Box (SABB) and Beta Gimbal Assembly (BGA) and configuring the automobile-sized SARJ and its drive-lock assemblies.

Joe Tanner (left) and Heidemarie Stefanyshyn-Piper at work during STS-115. Photo Credit: NASA

Joe Tanner (left) and Heidemarie Stefanyshyn-Piper at work during STS-115. Photo Credit: NASA

In doing so, Stefanyshyn-Piper became only the eighth woman in history to make an EVA, following in the footsteps of trailblazing pioneers Svetlana Savitskaya and Kathy Sullivan, Hubble Space Telescope (HST) veteran Kathy Thornton and the world's then-most-experienced female spacewalker, Peggy Whitson. EVA veteran Tanner, on the other hand, had previously spacewalked on five occasions outside Hubble and the space station, totaling more than 35 hours. Working briskly, the duo had almost finished the entirety of their activities within 3.5 hours, allowing Mission Control to assign them a number of "get-ahead" tasks. These included the removal of SARJ launch locks, although a minor glitch occurred when a bolt and washer came loose and floated off into space.

Next day, 13 September, it was the turn of Burbank and MacLean, both first-time spacewalkers. Interestingly, MacLean became only the second Canadian—after STS-100's Chris Hadfield—to perform an EVA. He and Burbank spent seven hours and 11 minutes wrapping up the activation of the SARJ, completing the release of its launch locks. Assisting them from inside Atlantis' cockpit were Tanner, as Intravehicular  (IV) crewman, with Stefanyshyn-Piper commanding the RMS. However, the spacewalkers were forced to overcome a handful of minor problems, including a malfunctioning helmet camera, a broken socket tool and stubborn and loose bolts. Following the return of Burbank and MacLean inside the shuttle, Mission Control activated and commenced a four-hour checkout of the SARJ, successfully engaging the first of its drive-lock assemblies and rotating the joint by 180 degrees.

Later, the second drive-lock assembly was also engaged, with the intention that the SARJ would be rotated again 360 degrees. However, despite several attempts, controllers on the ground did not receive an indication that the drive-lock assembly had properly engaged and the planned deployment of the P-3/P-4 solar arrays was postponed until the problem could be resolved. Engineering teams subsequently developed a software workaround and on the 14th the arrays were confirmed successfully deployed at 8:44 a.m., essentially doubling the space station's electricity-generating capability. The deployment process required a little over 4.5 hours to complete and the sole difficulty of note was a slight "sticking" (or "stiction") of the panels as they unfurled. That said, actual usage of the power would not come until the crew of shuttle mission STS-116—planned for December 2006—extensively rewired the station's electrical and cooling systems.

With several mission objectives rescheduled and reprioritized following the delayed P-3/P-4 deployment, Tanner and Stefanyshyn-Piper readied themselves and their suits for STS-115's third and final EVA on 15 September. After completing another overnight campout, a Remote Power Controller (RPC) tripped, causing a loss of power to Quest's depressurization pump. The astronauts transferred back into the station's adjacent Unity node, whilst continuing their pre-breathing protocol on masks, as engineers tackled the problem. It was eventually narrowed down to a momentary electrical spike and, after a resultant 45-minute delay, the pair ventured outside at 6 a.m.

Atlantis alights on Runway 33 at the Kennedy Space Center (KSC) on 21 September 2006, wrapping up 12 days in orbit. Photo Credit: NASA, via Joachim Becker/SpaceFacts.de

Atlantis alights on Runway 33 at the Kennedy Space Center (KSC) on 21 September 2006, wrapping up 12 days in orbit. Photo Credit: NASA, via Joachim Becker/SpaceFacts.de

Both spacewalkers split up for their respective tasks, as Tanner set to work installing bolt retainers on the BGA of the P-6 truss segment, helping to orient the pitch of its own solar arrays and Stefanyshyn-Piper retrieved the Materials on the International Space Station (MISSE)-5 experiment. Working together, they prepared the P-3/P-4 Photovoltaic Radiator (PVR) for deployment and replaced an S-band Antenna Support Assembly (SASA) communications antenna on the S-1 truss for use by the STS-116 crew, together with a baseband signal processor and transponder. Ending after six hours and 42 minutes, EVA-3 brought STS-115's log of spacewalking up to 20 hours and 19 minutes.

Finally, in the early hours of 17 September, the time had arrived for Atlantis to depart. After sharing farewell wishes to the Expedition 13 crew, the hatches were closed for the last time and Jett undocked from the space station at 8:50 a.m. Ferguson then took the controls for a traditional flyaround inspection of the unusual T-shaped configuration of the ITS, before a final separation maneuver at about 10:30 a.m. With the Expedition 14 crew launched toward the ISS a day or so later, the unique opportunity arose early on 19 September for three different sets of space travelers to communicate with each other, via radio.

"It's a little crowded in the sky today," said Williams, then told the upcoming Expedition 14 crew: "We look forward to having you guys on board." From Atlantis, Jett offered his good wishes to Williams and Vinogradov, ahead of their scheduled return home in late September. "We'll see you back on Earth sometime soon."

Atlantis' originally planned landing date on 20 September was postponed by 24 hours, in order for a focused late inspection of the shuttle's exterior. This had become necessary when video footage highlighted a piece of debris close to the vehicle. In a sense, this was just as well, because weather forecasts at the Shuttle Landing Facility (SLF) at the Kennedy Space Center (KSC) in Florida were none too favorable. Operating the RMS, Burbank, MacLean and Ferguson spent several hours painstakingly examining the shuttle's exterior and acquiring imagery which was then pored over by specialists on the ground. A shim and a spacer piece had been observed protruding from thermal tiles earlier in the flight and turned out to be missing, but it was unknown of they were the observed debris. However, Mission Control gave the spacecraft a clean bill of health and the STS-115 astronauts geared up for their scheduled landing on 21 September.

With light winds and a few clouds forecast over Cape Canaveral, Atlantis' crew performed the deorbit burn at 5:14 a.m., thereby committing themselves to a touchdown an hour later. At 6:21 a.m., in the darkness of a Florida pre-dawn, Jett guided the shuttle to a smooth landing on Runway 33. In spectacular fashion, his crew had resumed a task left undone following the agony of Columbia and had set the space station on course for completion and full utilization into the second decade of the 21st century.

 

Copyright © 2016 AmericaSpace - All Rights Reserved

 


 

 

Monday, September 5, 2016

Damaging & Costly Space policy!

Another policy of waste by this ADM, everybody knows that the Hubble needs servicing & orbit adjustment if it was to survive. This will be true of JWT also. However the adm goes ahead & destroys the USA manned capability.
Re is NASA going to let Hubble burn up? Popular Science & Lost in Space by Abbey.

Is NASA Going To Let The Hubble Telescope Burn Up? | Popular Science

This DS adm eliminated our capability to maintain!
http://www.popsci.com/last-mission-hubble-why-nasa-going-let-telescope-burn


Sent from my iPad

Why? No to X37C crewed vehicle!

Why Did NASA say no to making X37C a crewed vehicle?
Also, read Abbey Lost in Space re X37C

Jim Hillhouse
March 5, 2014 at 7:19 pm
Well, after talking to Capitol Hill staffers, they too are suffering the same head issues I am. At least I'm in good company.

Rather than talk about what Congress will or will not pay for, let's review what Congress has done since 2010 on space funding.

Congress has, on its own and despite both opposition from the Administration and aggressive delaying tactics on the SLS and Orion programs from NASA, appropriated those amounts needed to keep both Orion and SLS on track. And just as it's done since 2010, Congress is going to do what it wants on HSF, which is fund Orion and SLS fully.

What Congress sees is not a justification for Commercial Crew. Far from it. Congressional staffers are well aware of the true progress of that program and no, none of those players are getting us to ISS anytime soon. That's largely NASA's fault since Congress has informed it that the CCP program needed to down-selected years ago to better focus limited resources for faster progress. But NASA's leadership didn't do that for political reasons. Loose Boeing and CCP looses luster and respectability. Loose Sierra Nevada and we working on three capsule programs. And if you want to make engineers working in GN&C or ELSS laugh, tell them that one of the CCP companies will be flying crews by 2016. Guffaws galore.

And those in Congress specializing in space are well aware that, had getting independent access to ISS for our nation really been Job #1 for NASA's leadership, then the Administration would have approved Boeing's proposal for the X-37B follow-on, the 5 crew X-37C. We are talking about a dependable spacecraft that can sit in orbit for over a year and NASA said no to making it a crewed vehicle. Why?

http://www.nasaspaceflight.com/…/x-37b-expanded-capabiliti…/

What Congress does see is that if we had not gone through the nonsense of 2010, we would be much closer to our own capability to launch crews to ISS than we are today. Instead, Neil Armstrong was right–the Administration changed our nation's HSF course in secret, without consultation, and mucked things up.

When it comes to the Moon, Congress is funding $3.5B annually on the DDTE for Orion and SLS. Anything else will have to wait for a new Administration as there is zero trust right now in Congress of anything the White House or NASA HQ are selling about human spaceflight.


Sent from my iPad